    ♦ Designated routes will be established for access to the work area and for movement of material and
         equipment Movement of material and equipment shall be scheduled with Sama Global.

    ♦ Access to the site will be provided through the Administrator or other designated persons. A list of
         expected employees should be provided to Sama Global before employees arrive at the site.
         This will allow time to prepare for proper access documents to be prepared.

     Site speed limits and traffic rules shall be observed. Never leave vehicle engines running without a 
         driver. Always wear seat belts. Personnel shall not be carried in the bed of a truck with materials. 
         Employees may be transported in the bed of a pick‐up truck while seated flat on the floor, arms 
         inside the bed, against the cab or sidewalls of the truck. No one is to be seated within 2 feet from 
         the tailgate of the truck. Materials and employees may not be transported together. The driver of 
         the vehicle is responsible for assuring that all passengers obey the site guidelines as well as the law. 

13. HOUSEKEEPING

     During the course of construction, alteration, or repairs, all debris shad is kept cleared from work 
         areas, passageways, and stairs in and around buildings or other structures. 

     Employees shall promptly clean up all scrap materials and waste materials produced as a result of its 
         operation and place that waste into containers. 

     In the event of a spill of any material by Employees, other than potable water onto the ground. 
         Employees shall immediately take steps to contain said material and contact Sama Global HSE . The 
         clean up which will ensue shall be in accordance with Sama Global, federal, state and municipal 

    ♦ lubricants, solvents, chemicals, paints, etc.) shall be contained for proper storage
         and disposal. Employees shall ensure that temporary containers are in compliance with all state and 
         federal regulations employees shall properly label containers for disposal. 

     Written spill prevention program for the work location and shall provide a copy to the project. 

     Projects administration will maintain road and other site operating facilities affected by its 
         operations in a clean and uncluttered condition at all times. All obstacles must be removed. Any and 
         all dirt, mud, concrete, debris, trash, waste, spoil, refuse, etc. shall be cleaned up and removed 
         immediately. 
‫ﻤﯿـــــﺔ‬S‫ﺎﻟ‬A‫ﻟﻌ‬M‫ﺎ ا‬A‫ـــ‬G‫ﻤــ‬L‫ﺳ‬OBAL
14. WORKING	CONDITIONS
14.1	 Drug	Abuse	and	Alcohol	Policy	

To the extent allowable by law, Projects will develop, implement and maintain a "Drug Abuse and Alcohol 
Policy" which is consistent with that of Sama Global. 

14.2	 Coordination	with	Others	

Where employee’s work must be performed in conjunction with work by others, Projects will 
cooperate with Sama Global in scheduling, coordinating, and sequencing its work with that of others so 
all work may proceed with minimal interference or delay. 

14.3	 Co‐Occupancy	

Supervisors shall provide all measures required to protect property, existing facilities and work performed 
by others from damage due to operations or negligence. Sama Global may suspend project operation until 
such protective measures are provided, and the cost for stand‐by of Subcontractor's personnel and 
equipment shall be from Subcontractor's account 