Page 36 - SAMA HSE PLAN
P. 36
Sama Global HSE Plan December 2023
10.20.6 Transportation
1. Basic primary: _____________________________________________________________
2. Basic secondary: ___________________________________________________________
3. Emergency primary: ________________________________________________________
4. Emergency secondary: ______________________________________________________
G. Emergency Phone Numbers
Emergency phone numbers are updated when necessary and are posted at all telephones and at:
________________________________________________________________________________________
ﻤﯿـــــﺔSﺎﻟAﻟﻌMﺎ اAـــGﻤــLﺳOBAL
10.21 Accident Investigation
Written procedures and dedicated forms are on file and used as needed for the following (check applicable):
_____ Lost Time Accident Procedure
_____ Near‐Miss Accident Procedure
_____ Third Party Liability Investigation
_____ Accident/Incident Report Procedure
_____ Motor Vehicle Accident Procedure
_____ Off‐the‐Job Injury/Illness Procedure
___________________________________ is responsible for conducting and documenting accident
investigations, reports, and logs.
___________________________________ is responsible for immediate verbal notification of all major
accidents to all concerned parties.
10.22 Recordkeeping
10.22.1 OSHA 300
The OSHA 300 Log is maintained in accordance with the Recordkeeping Guidelines manual. OSHA 300 Logs
(current year and past 5 years) and corresponding E‐1's are maintained at:
________________________________________________________________________________________
At the end of the year, OSHA 300A Logs are totaled and posted from February 1 until April 30 in the
following location:
________________________________________________________________________________________
All required training records (with signature, dates, topics and verification of understanding documentation)
are filed at:
________________________________________________________________________________________
First Aid Log
Maintained by: _________________________________________________
Filed at: _______________________________________________________
10.22.2 Client‐required Documentation
The following documentation is required by the client to be furnished on the specified basis:
________________________________________________________________________________________
________________________________________________________________________________________
Revision B For Sama Global Use Only Page 34 of 60