10.22.3	 Company‐Required	Documentation	

Monthly report package, consisting of the Drug & Alcohol Report, Monthly Summary, OSHA 300 Log, and 
First Aid Register, is maintained/distributed by:  
  _______________________________________________________________________________________  

‫ﻤﯿـــــﺔ‬S‫ﺎﻟ‬A‫ﻟﻌ‬M‫ﺎ ا‬A‫ـــ‬G‫ﻤــ‬L‫ﺳ‬OBAL10.23	 Required	Plans,	Programs,	and/or	Procedures	(as	applicable)	

                                     Layout Plans for Temporary Facilities 

                                     Emergency Response Plans 
                                          Emergency plans to ensure employee safety in case of fire or other emergency shall be
                                              prepared, in writing, and reviewed with all affected employees.  Emergency plans shall be tested
                                              to ensure their effectiveness.
                                          Emergency plans shall include provisions for:
                                             i. Fire Fighting
                                            ii. Spill Response
                                            iii. Wild Land Fire Prevention/Response
                                            iv. Man Overboard/Abandon Ship

                                     Hazard Communication Program (including inventory of hazardous materials) 

                                     Respiratory Protection Plan 

                                     Health Hazard Control Program 

                                     Lead Abatement Plan 

                                     Asbestos Abatement Plan 

                                     Abrasive Blasting 

                                     Confined Space Program 

                                     Hazardous Energy Control Plan  

                                     Critical Lift Plan 

                                     Contingency Plan for Severe Weather 

                                     Access and Haul Road Design Plan 
                                          Equipment usage, traffic density, and hours of operation.
                                          Road layout and widths, horizontal and vertical curve data, and sight distances.
                                          Sign and signalperson requirements, road markings, and traffic control devices.
                                          Drainage controls.
                                          Points of contact between vehicles and the public, and safety controls at these points of
                                              contact.
                                          Maintenance requirements, including roadway hardness and smoothness and dust control.

                                     Demolition Plan (engineering and asbestos and lead surveys) 
                                          All asbestos and lead must be identified prior to the commencement of demolition of a facility.

                                     Emergency Rescue for Underground Construction 

                                     Underground Construction Fire Prevention and Protection Plan 

                                     Compressed Air Plan 

Revision B                      For Sama Global Use Only  Page 35 of 60